The five programme risks on every cold storage build

Refrigeration lead times, floor heave protection and commissioning windows are where cold storage programmes are won or lost.
Cold storage projects fail on programme far more often than they fail on cost. The critical path almost always runs through refrigeration procurement and commissioning, not the base build.
Order long-lead plant before the slab is poured, protect freezer floors with under-slab heating from the outset, and reserve a realistic pull-down and testing window.
Staging handover by temperature zone lets an operator begin stocking ambient and chilled areas while freezer testing continues.